Abstract
In operations research, the equipment replacement process is usually modeled in discrete time. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. The paper introduces and analyzes a model that unites both these approaches. The structure of optimal replacement, transition, and long-term dynamics, and clustering and splitting of replaced machines are discussed and illustrated with numeric examples. Equipment splitting is demonstrated when the optimal equipment lifetime increases. © 2010 International Federation of Operational Research Societies.
| Original language | American English |
|---|---|
| Journal | Default journal |
| State | Published - Jan 1 2010 |
Keywords
- Discrete–continuous models
- Equipment clustering and splitting
- Machine lifetime
- Optimization
- Vintage capital models
Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS