Skip to main navigation Skip to search Skip to main content

Discrete–continuous analysis of optimal equipment replacement

  • Houston Baptist University

Research output: Contribution to journal › Article › peer-review

Abstract

In operations research, the equipment replacement process is usually modeled in discrete time. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. The paper introduces and analyzes a model that unites both these approaches. The structure of optimal replacement, transition, and long-term dynamics, and clustering and splitting of replaced machines are discussed and illustrated with numeric examples. Equipment splitting is demonstrated when the optimal equipment lifetime increases. © 2010 International Federation of Operational Research Societies.

Original languageAmerican English
JournalDefault journal
StatePublished - Jan 1 2010

Keywords

  • Discrete–continuous models
  • Equipment clustering and splitting
  • Machine lifetime
  • Optimization
  • Vintage capital models

Cite this